Stormwater Atlas

City of Pasadena

Harris County Low Impact Development & Green Infrastructure Design Criteria for Storm Water Management

CityTexasmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Municipality coverage via Harris County LID/GI SWQ criteria (Houston metro pattern). Prefer city-specific drainage criteria PDF if found.

Fields not found in document: design_criteria.design_storm_return_periods_years

Document Metadata

Jurisdiction level
City

No evidence cited

State
Texas

No evidence cited

Version / edition
Adopted April 2011

No evidence cited

Adoption / effective date
2011-04-01

No evidence cited

Last revised date
2011-04-01

No evidence cited

Relationship to state manual
adopts state manual directly

No evidence cited

Design Criteria

Design storm return periods (years)
Not found in document

No evidence cited

Water quality volume method
Projects exceeding one acre require a Storm Water Quality (SWQ) Permit and SWQMP; treat the first 1 inch of runoff. LID IMPs may satisfy quality and detention credits per Harris County criteria. Conventional gravity detention minimum rate 0.55 ac-ft per acre.

treat the first 1 inch of runoff

Harris County LID/GI Design Criteria

Peak flow calculation method(s)
Detention and hydrograph matching per HCPID-AED / HCFCD requirements, Minimum detention 0.55 ac-ft/acre for gravity systems

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Bioretention systems, Vegetated swale / bioswale, Permeable pavement, Rainwater harvesting, Green roof, Filter strips / tree box filters

No evidence cited