Stormwater Atlas

City of Lubbock

Drainage Criteria Manual

CityTexasmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Lubbock DCM Nov 2019; playa-centric. Confirm Chapter 9 numeric WQ sizing if needed. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.state_code

Document Metadata

Jurisdiction level
City

City of Lubbock

Cover

State
Not found in document

No evidence cited

Version / edition
November 2019

is adopted and becomes effective on November 19, 2019. Freese and Nichols, Inc. coordinated the revisions to the 1997 criteria, along with Halff Associates Inc. and Hugo Reed and Associates, Inc. as part of the Stormwater Master Plan update. 1.1 DEFINITIONS The following defi

p. 6

Adoption / effective date
2019-11-19

adopted and becomes effective on November 19, 2019

Introduction

Last revised date
2019-11

is adopted and becomes effective on November 19, 2019. Freese and Nichols, Inc. coordinated the revisions to the 1997 criteria, along with Halff Associates Inc. and Hugo Reed and Associates, Inc. as part of the Stormwater Master Plan update. 1.1 DEFINITIONS The following defi

p. 6

Relationship to state manual
independent

City of Lubbock Drainage Criteria Manual

Title

Design Criteria

Design storm return periods (years)
100-year

100-Year Stormwater Capacity Analysis

Figure 4.1

Water quality volume method
Chapter 9 Stormwater Quality covers post-construction BMPs and structural controls. Primary drainage design emphasizes playa lakes, street/alley conveyance for the 100-year event, and detention/retention (Chapter 7, Modified Rational Method).

9.0 STORMWATER QUALITY / Post-Construction Best Management Practices

Chapter 9

Peak flow calculation method(s)
Rational Method (Chapter 3), Street hydraulic design / 100-year street capacity analysis, Playa hydrologic routing and volumetric mitigation (Chapter 5), Detention/retention Modified Rational Method (Chapter 7), TxDOT IDF coefficients

Rational Method / Playa Analysis / Detention and Retention

Chapters 3, 5, 7

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Post-construction structural BMPs, Detention / retention basins, Playas (overflow and non-overflow), Sediment and erosion control BMPs

Structural Controls / Detention/Retention Basin

Chapters 7–9