Stormwater Atlas

City of El Paso

Stormwater Design Manual

CityTexasmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

El Paso SWDM 2022; Atlas 14 + Rational/HEC-HMS. Confirm exact street vs major conveyance return periods from tables. Pipeline excerpt repair removed 4 unlocated citation(s).

Fields not found in document: document_metadata.adoption_or_effective_date, document_metadata.state_code, document_metadata.version_or_edition, document_metadata.last_revised_date, design_criteria.required_hydrologic_hydraulic_software

Document Metadata

Jurisdiction level
City

City of El Paso

Title

State
Not found in document

No evidence cited

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

Stormwater Design Manual

Title

Design Criteria

Design storm return periods (years)
50-year, 100-year

(on roadways of four lanes or more) 100-year Within curb height (maximum curb h=1½” below top of curb and 50 cfs max) Streets (Local Streets) 50-year One lane high and dry 100-year Within curb height (maximum curb h= 1½” below top of curb and 50 cfs max) Storm Drain System 10

p. 12

Water quality volume method
Bioretention and other water quality BMPs addressed in Section 14; Atlas 14 rainfall used for hydrologic design.

bioretention

Section 14

Peak flow calculation method(s)
Rational Method, HEC-HMS for larger watersheds, Streets / storm drains / channels / culverts commonly designed for 100-year (also 50-year street criteria)

Rational Method / HEC-HMS

Hydrology

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Bioretention, Detention, Storm drains, Channels, Culverts

Bioretention

Section 14