Stormwater Atlas

City of Mesquite

Engineering Design Manual — Section 3 Drainage Design Requirements

CityTexasmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Full EDM Sections 1–9 PDF; drainage criteria concentrated in §3. Edition date not clear on extract.

Fields not found in document: document_metadata.adoption_or_effective_date, document_metadata.last_revised_date, design_criteria.required_hydrologic_hydraulic_software

Document Metadata

Jurisdiction level
City

No evidence cited

State
Texas

No evidence cited

Version / edition
Engineering Design Manual Sections 1–9

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

independent city engineering design manual

Coverage note

Design Criteria

Design storm return periods (years)
25-year, 100-year

Table 3-1 ... Enclosed Storm Drain Systems and Inlets 100-year ... Detention and Retention Basins 100-year

Table 3-1

Water quality volume method
Table 3-1: enclosed storm drains/inlets, roadside ditches, streets, culverts, channels, and detention/retention sized for 100-year (staged outlet for basins). Pedestrian bridges 25-year. Hydrology: Rational ≤200 ac; unit hydrograph / NCTCOG iSWM Hydrology Technical Manual for larger areas. Detention may be required per §3.9 / downstream assessment.

No evidence cited

Peak flow calculation method(s)
Rational Method (≤200 acres), NCTCOG iSWM Hydrology Technical Manual / unit hydrograph methods, Detention and retention facility design (§3.9), Downstream assessments (§3.10)

current edition of the NCTCOG Integrated Stormwater Management (iSWM™) Hydrology Technical Manual

§3.2

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Enclosed storm drain systems, Open channels, Detention / retention facilities, Best Management Practices (maintenance plans required), Erosion and sediment controls (§3.11)

No evidence cited