Harris County
Harris County Low Impact Development & Green Infrastructure Design Criteria for Storm Water Management
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
LID/GI design criteria (2011). Full HCFCD PCPM remains portal-gated; this PDF covers SWQ 1" treatment and LID IMPs used with county detention criteria. Pipeline excerpt repair removed 4 unlocated citation(s).
Document Metadata
No evidence cited
“Harris County Flood Control District”
Cover
No evidence cited
No evidence cited
No evidence cited
“interim guidelines ... HCPID-AED and HCFCD Storm Water Management Programs”
Background
Design Criteria
No evidence cited
“Treatment of the first 1" of runoff ... Storm Water Quality Permit required”
Table 5 / §2.4
“The minimum detention rate for gravity drained detention basin systems is 0.55 ac-ft”
Table 3
No evidence cited
“Roof Runoff & Impervious Surfaces 3.2 Vegetated Filter Strip 3.3 Vegetated Swale 3.4 Rainwater Harvesting 3.5 Bioretention Systems 3.5.1 Requirements 3.5.2 Sizing a Bioretention system 3.5.3 Engineered Soil Media 3.5.4 Underdrain 3.5.5 Observation/Cleanout Pipe 3.5.6 Positive O”
p. 2