Stormwater Atlas

City of Frisco

Engineering Standards — Design Standards (Part A)

CityTexashighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Frisco 2025 Design Standards Part A; Section 4 drainage. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.state_code

Document Metadata

Jurisdiction level
City

City of Frisco

Title

State
Not found in document

No evidence cited

Version / edition
October 2025

Table of Contents October 2025

TOC

Adoption / effective date
2025-10-28

Standards Table of Contents October 2025 TC-1 Table of Contents Part A ñ Design Standards Page SECTION 1 GENERAL REQUIREMENTS 1-1 1.01 Short Title ..................................................................................................................1-2 1.0

p. 1

Last revised date
2025-10-28

October 2025

Section headers

Relationship to state manual
independent

City Engineering Standards / NCTCOG

General

Design Criteria

Design storm return periods (years)
2-year, 5-year, 25-year, 100-year

2-year 5-year 25 year 100- year

Section 4.02

Water quality volume method
Section 4 Drainage Design Requirements include stormwater quality treatment (4.18), detention/retention facility design (4.09), and sustainable development provisions. Street and enclosed-system conveyance sized with multi-frequency storms including 100-year street capacity / dry-lane criteria; references NCTCOG construction standards.

4.18 Stormwater Quality Treatment

Section 4 TOC

Peak flow calculation method(s)
Rational Method / Q=CIA for enclosed systems and inlets, Multi-frequency rainfall (2-, 5-, 25-, 100-year; Hydro-35 / TP-40 era tables referenced), Downstream assessment and detention sizing (4.03 / 4.09), 100-year street capacity / dry-lane criteria

100-year runoff, Q=CIA (cfs)

Section 4 inlet design

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Detention / retention facilities, Stormwater quality treatment BMPs, Open channels / culverts / energy dissipators, Erosion and sedimentation controls

Detention/Retention Facility Design / Stormwater Quality Treatment

Section 4.09 / 4.18