Stormwater Atlas

City of Amarillo

Storm Water Management Criteria Manual

CityTexasmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

2008-posted criteria manual still hosted 2024; confirm current adoption status. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: document_metadata.adoption_or_effective_date, design_criteria.required_hydrologic_hydraulic_software, document_metadata.last_revised_date

Document Metadata

Jurisdiction level
City

CITY OF AMARILLO

Cover

State
Texas

2-6 Depth-Duration-Frequency Data for Amarillo. Texas . . . . . . . . . . . . . . . . . . . 2-19 SECTION 3 STREET DRAINAGE . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1 Minor Storm Runoff Allowable Street Use 3-6 3-2 Manning's Roughness Coefficients for Streets and G

p. 13

Version / edition
Posted on City of Amarillo Web Page 03/13/08

Management Criteria Manual CITY OF AMARILLO

p. 2

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

City Storm Water Management Criteria Manual

Introduction

Design Criteria

Design storm return periods (years)
2-year, 5-year, 10-year, 25-year, 100-year

2-Year / 5-Year / 10-Year / 25-Year Peak Flow Curves

Chapter 2 figures

Water quality volume method
Minor and major drainage systems with design storm frequency criteria; Rational Method hydrology; street capacity for minor/major storms; detention and retention provisions (1.3.15). Peak flow curves provided for 2- through 100-year events.

Minor Storm Provisions / Major Storm Provisions / Detention and Retention

1.3 / 1.3.15

Peak flow calculation method(s)
Rational Method, Minor / major storm street and gutter capacity, Storm sewer design storm frequency tables, Detention and retention sizing

2.2 RATIONAL METHOD

Chapter 2

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Detention facilities, Retention facilities, Storm sewers / street conveyance, Open channels / culverts

Detention and Retention

1.3.15