City of Houston
Infrastructure Design Manual Chapter 9 Stormwater Design and Water Quality Requirements
Document Metadata
“Drainage criteria administered by the City of Houston and complemented by Harris County and the Harris County Flood Control District (HCFCD)”
Section 1, 9.1.02.A, Page 9-2
“Infiltration report of soil testing, signed and sealed by a Professional Engineer licensed in the State of Texas”
Section 1, 9.1.04.O, Page 9-7
“07-01-2022”
Page footer throughout (e.g., Page 9-0)
“07-01-2022”
Page footer throughout (e.g., Page 9-0)
“07-01-2022”
Page footer throughout (e.g., Page 9-0)
“Drainage criteria administered by the City of Houston and complemented by Harris County and the Harris County Flood Control District (HCFCD)”
Section 1, 9.1.02.A, Page 9-2
Design Criteria
“Table 9.1 – Rainfall Intensity Coefficients ... 2-year ... 5-year ... 10-year ... 25-year ... 50-year ... 100-year ... 500-year”
Section 2A, Table 9.1, Page 9-11
“At a minimum, the system must be designed to treat the first 1/2 inch of runoff, except as noted in the SWQGM or the MDC.”
Section 9, 9.9.01.C.3, Page 9-46
“Rational Method: The Rational Method will be used to estimate peak flows for individual drainage areas up to 200 acres in size, and for project areas up to 640 acres in size.”
Section 2A, 9.2.01.B.2.a, Page 9-12
“HouStorm shall be used to perform 2-year and inlet design analysis and design of storm drainage systems”
Section 2A, 9.2.01.A, Page 9-10
“Low Impact Development (LID) techniques that are considered acceptable for achieving detention are Bioretention, Infiltration Trenches, Porous Pavement, Vegetative Swales, Green Roof, Hard Roof, and Rain Barrels.”
Section 2A, 9.2.01.H.3.j, Page 9-31