Stormwater Criteria Manual

CityTexashighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Fort Worth July 2024 SCM; WQ Option 2 is iSWM-aligned but City notes WQ not currently required by CFW itself. Pipeline excerpt repair removed 2 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.version_or_edition, document_metadata.last_revised_date

Document Metadata

Jurisdiction level
City

Adoption of Manual by City of Fort Worth

Adoption

State
Texas

TPDES Stormwater permit

Design options table

Version / edition
Not found in document

No evidence cited

Adoption / effective date
2024-07-15

This Stormwater Criteria Manual ("Manual") is adopted and becomes effective on July 15, 2024.

Adoption

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

The North Central Texas Council of Government ("NCTCOG") iSWM Technical Manuals are adopted and incorporated herein by reference.

Adoption

Design Criteria

Design storm return periods (years)
1-year, 5-year, 100-year

No increase greater than 0.1 feet in 1-, 5-, and 100-year flood elevations

Flood criteria

Water quality volume method
Water Quality Protection Volume (WQV) Option 2: treat TSS for runoff from rainfalls up to 1.5 inches (85th percentile storm). Note: water quality protection is not currently required by the City but may be required by TRWD or other agencies. Manual incorporates NCTCOG iSWM Technical Manuals by reference.

Treat the Water Quality Protection Volume (WQV) by reducing total suspended solids from the Development site for runoff resulting from rainfalls of up to 1.5 inches (85th percentile storm)

Design Options / Water Quality

Peak flow calculation method(s)
Streambank Protection: on-site controlled release of 1-year, 24-hour storm over 24 hours (SPV) or downstream mitigation options, Flood Mitigation: detention to completely mitigate increase in peak discharge; Adverse Impact Assessment / Zone of Influence, Regulatory design storm: 1% annual chance (100-year) on ultimate development, NCTCOG iSWM Technical Manual hydrologic methods by reference

Provide on-site controlled release of the 1- year, 24-hour storm event over a period of 24 hours (Streambank Protection Volume, SPV)

Streambank Protection Option 3

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Dry detention pond, Underground detention, Integrated site design practices, iSWM structural controls (by reference to NCTCOG Technical Manuals)

Dry Detention Pond / Underground Detention

Tables 3.22-3.23