City of Killeen
Drainage Design Manual
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Body PDF; city also posts chapter amendments (2012/2013) that should be consulted for latest policy wording.
Document Metadata
No evidence cited
No evidence cited
No evidence cited
No evidence cited
No evidence cited
“independent city drainage design manual”
Coverage note
Design Criteria
“Stormwater runoff peak flow rates for the 25- and 100-year frequency storms ... intercept, contain, and transport all runoff from the 25-year frequency storm”
§1.2 Drainage Policy
“Pre-developed peak flows generated from the 25-year frequency storm shall not be increased ... 100-year storm event shall be passed from the detention facility through an emergency spillway”
§1.2.8 Stormwater Detention
No evidence cited
No evidence cited
No evidence cited