City of San Diego
Stormwater Standards
This extraction needs human review.
Local queue text is truncated relative to full ~786-page PDF; core pollutant-control DCV (85th percentile), hydromodification 0.1–0.5Q2 to Q10, and BMP category table are well supported. Appendix G software section body is incomplete in the local text—SDHM and EPA SWMM appear in sizing/appendix excerpts. 100-year appears mainly in floodplain/exemption context, not as pollutant-control design storm.
Document Metadata
“The City of San Diego (City) is required to adopt jurisdiction specific local BMP Design Manual”
Introduction / Purpose
“California Regional Water Quality Control Board for the San Diego Region (SDRWQCB)”
Purpose of the Storm Water Standards
“The City of San Diego | Stormwater Standards | August 2024 Edition”
Header / Title
“Effective date: August 15, 2024”
Title Page
“August 2024 Edition”
Title Page / Headers
“Part 1 of the Stormwater Standards is the adaption of the Model BMP Design Manual to the specific... Standards is designated as the City of San Diego BMP Design Manual”
Introduction
Design Criteria
“For flow rates ranging from 10 percent, 30 percent or 50 percent of the pre-development 2-year runoff event (0.1Q2, 0.3Q2, or 0.5Q2) to the pre-development 10-year runoff event (Q10), the post-project discharge rates and durations must not exceed the pre-development rates and durations by more than 10 percent”
Section 6.3, Page 6-4
“Each PDP shall implement BMPs that are designed to retain (i.e. intercept, store, infiltrate, evaporate, and evapotranspire) onsite the pollutants contained in the volume of stormwater runoff produced from a 24-hour, 85th percentile storm event (Design Capture Volume (DCV))”
Section 2.2.1, Page 2-5
“Q2 and Q10 refer to flow rates determined based on either continuous simulation hydrologic modeling or the following approved regression equations”
Section 6.3, Page 6-4
“through reporting of output from the San Diego Hydrology Model, or through other continuous simulation modeling meeting the criteria in Appendix G, as acceptable to the City Engineer”
Appendix B.4, Page B-28
“Retention Harvest and Use (HU) HU-1: Cistern; Retention Infiltration (INF) INF-1: Infiltration basin INF-2: Bioretention INF-3: Permeable pavement INF-4: Dry Wells; Partial Retention (PR) PR-1: Biofiltration with partial retention; Biofiltration (BF) BF-1: Biofiltration BF-2: Nutrient Sensitive Media Design BF-3: Proprietary Biofiltration; Flow-thru treatment control (FT) FT-1: Vegetated swales FT-2: Media filters FT-3: Sand filters FT-4: Dry extended detention basins FT-5: Proprietary flow-thru treatment control”
Section 5.5 / Table, Page 5-13