California Department of Transportation (Caltrans)
Construction Site Best Management Practices (BMP) Manual
Document Metadata
“California Department of Transportation”
Title Page
“Sacramento, California 95814”
Title Page
“March 2024 CTSW-RT-24-425.11.1”
Title Page
“Report Date: March 2024”
Caltrans Technical Report Documentation Page
“Report Date: March 2024”
Caltrans Technical Report Documentation Page
“construction projects with 1 acre or more of soil disturbance to comply with the CGP Order WQ 2022-0057-DWQ and amendments thereto”
Section 1.2.2, Page 1-2
Design Criteria
“A 2-year, 24-hour storm event has been used by many as a default event, but recent studies have shown that this may oversize the system”
Section 7.1.5 NS-5 Clear Water Diversion, Page 7-5
No evidence cited
“The equivalent sediment load may be calculated using the Revised Universal Soil Loss Equation, version 2 (RUSLE2) or another method approved by the Regional Water Board.”
Section 2.3.1 Surface Water Buffers, Page 2-7
“calculated using the Revised Universal Soil Loss Equation, version 2 (RUSLE2)”
Section 2.3.1 Surface Water Buffers, Page 2-7
“Caltrans Construction Site BMPs are divided into six categories, as shown in Table 2-1: Temporary Soil Stabilization, Temporary Sediment Control, Wind Erosion Control, Tracking Control, Non-Stormwater Management, Waste Management and Materials Pollution Control”
Section 2.2, Table 2-1, Pages 2-5 to 2-7