Stormwater Atlas

City of Oakland

Storm Drainage Design Standards

CityCaliforniamediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Oakland 2014 drainage standards; C.3 WQ largely by reference to MRP/regional guidance. Pipeline excerpt repair removed 5 unlocated citation(s).

Fields not found in document: document_metadata.adoption_or_effective_date, design_criteria.required_hydrologic_hydraulic_software, document_metadata.state_code, document_metadata.version_or_edition, document_metadata.last_revised_date, document_metadata.relationship_to_state_manual, design_criteria.design_storm_return_periods_years

Document Metadata

Jurisdiction level
City

City of Oakland

Title

State
Not found in document

No evidence cited

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
Not found in document

No evidence cited

Design Criteria

Design storm return periods (years)
Not found in document

No evidence cited

Water quality volume method
C.3 stormwater quality measures referenced; primary document is drainage/hydraulics standards. Peak reduction into City system limited (up to 25%).

C.3 stormwater quality measures

References

Peak flow calculation method(s)
Modified Rational Method for watersheds <320 acres, Synthetic unit hydrograph for watersheds ≥320 acres, Detention designed for 100-year; up to 25% peak reduction into City system

Modified Rational / Synthetic UH; 25% peak reduction

Hydrology / detention

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Detention, C.3 stormwater quality measures (referenced)

................................ 5 3.6. Detention Facilities..................................................................................................... 5 4. TAILWATER ELEVATIONS IN FLOOD ZONES & DESIGN DISCHARGE FREQUENCIES ..............................................

p. 3