Stormwater Atlas

Alameda Countywide Clean Water Program (ACCWP) / City of Fremont

C.3 Stormwater Technical Guidance

Special DistrictCaliforniahighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

ACCWP C.3 TG v8.2; covers Fremont and other Alameda County MRP cities (aliases). Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: design_criteria.design_storm_return_periods_years, design_criteria.required_hydrologic_hydraulic_software

Document Metadata

Jurisdiction level
Special District

Clean Water Program / MRP municipalities

Introduction

State
California

California / Municipal Regional Permit

Introduction

Version / edition
Version 8.2 (May 19, 2024)

builders, and project applicants Version 8.2 MEMBER AGENCIES: Alameda Albany Berkeley Dublin Emeryville Fremont Hayward Livermore Newark Oakland Piedmont Pleasanton San Leandro Union City County of Alameda Alameda County Flood Control and Water Conservation District Zone 7

p. 1

Adoption / effective date
2024-05-19

May 19, 2024

Cover

Last revised date
2024-05-19

May 19, 2024

Cover

Relationship to state manual
independent

MRP Provision C.3

Introduction

Design Criteria

Design storm return periods (years)
Not found in document

No evidence cited

Water quality volume method
MRP Provision C.3 LID treatment: volume-based sizing (WEF/ASCE 80% capture / related methods) or flow-based sizing using 85th percentile rainfall intensity; biotreatment/bioretention preferred. Hydromodification management (Provision C.3.g) via flow duration control / BAHM where applicable.

85th percentile value / Volume-based BMP sizing criteria and 80 percent capture

Section 7.1 / glossary

Peak flow calculation method(s)
Volume-based BMP sizing (Section 7.1.1 / Appendix C worksheet), Flow-based treatment sizing (85th percentile intensity), Hydromodification management / BAHM flow duration control (Chapter 9)

Hydromodification Management / Flow Duration Control / BAHM

Chapter 9

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Bioretention / bioinfiltration, Biotreatment measures, Treatment trains, Hydromodification management measures, LID site design / source controls

Bioretention/BioInfiltration Area

Section 8.1