City of Orlando
Engineering Standards Manual
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Orlando ESM 2026 Ch 7; detailed numeric WQ volumes may defer to SFWMD/SJRWMD handbooks. Pipeline excerpt repair removed 2 unlocated citation(s).
Document Metadata
“City of Orlando corporate limits”
Purpose
“SFWMD Permit Information Manual”
Accepted criteria
No evidence cited
No evidence cited
No evidence cited
“SSRWMD Permit Information Manual, and SFWMD Permit Information Manual”
Accepted criteria
Design Criteria
“shall not increase the existing 100-year flood elevation”
Chapter 7 / related standards
“Pollution Abatement & Flow Attenuation”
Section 7.04.01
“Hydraulic Design Criteria”
Section 7.05
No evidence cited
“Retention/Detention Facilities”
Chapter 7