Stormwater Atlas

South Broward Drainage District

Stormwater Management Regulations, Standards, Procedures and Design Criteria Manual

Special DistrictFloridahighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

SBDD criteria cover southern Broward; Central Broward WCD has separate manual. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.state_code

Document Metadata

Jurisdiction level
Special District

SOUTH BROWARD DRAINAGE DISTRICT / BROWARD COUNTY, FLORIDA

Cover

State
Not found in document

No evidence cited

Version / edition
March 26, 2015 (Latest Revision February 2015)

March 26, 2015 / Latest Revision February 2015

Cover

Adoption / effective date
2015-03-26

March 26, 2015

Cover

Last revised date
2015-02-01

Latest Revision February 2015

Cover

Relationship to state manual
independent

supplement the established rules ... South Florida Water Management District (SFWMD)

Purpose

Design Criteria

Design storm return periods (years)
3-year, 100-year

100-year, 3-day storm event / second-order drainage system ... 3-year

Definitions / Design criteria

Water quality volume method
Must meet SFWMD criteria for dry pre-treatment retention/detention plus District water quality and quantity requirements. Discharge limited by basin (e.g., inches of runoff per day per acre for SFWMD C-9 / C-11 basins). Structures protected against 100-year, 3-day storm; second-order drainage systems designed for 3-year rainfall (FDOT Zone 10).

meet SFWMD criteria for dry, pre-treatment retention/detention

Water Quality

Peak flow calculation method(s)
3-year design for second-order / internal drainage (FDOT Zone 10 IDF), 100-year, 3-day flood protection / stage criteria, Allowable discharge rates by SFWMD basin (C-9 / C-11), Retention / detention with control structures

allowable discharge ... inch of runoff per day per acre ... SFWMD C-9 / C-11 basin

Discharge Criteria

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Dry retention / detention, Wet retention / detention, Control structures / weirs, Swales and conveyance systems

retention systems, detention systems

Definitions / criteria