Stormwater Atlas

Florida

Florida Stormwater Erosion and Sedimentation Control Inspectors Manual

StateDEP / DEQFloridahighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Pipeline excerpt repair removed 3 unlocated citation(s).

Fields not found in document: document_metadata.last_revised_date, design_criteria.peak_flow_calculation_method, design_criteria.required_hydrologic_hydraulic_software, document_metadata.state_code, document_metadata.version_or_edition, document_metadata.adoption_or_effective_date

Document Metadata

Jurisdiction level
State

Florida Department of Environmental Protection

Title Page

State
Not found in document

No evidence cited

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

Florida Department of Environmental Protection

Title Page

Design Criteria

Design storm return periods (years)
2-year, 10-year

peak runoff expected from the drainage area for a 10-year storm

Chapter 3, Page 106

Water quality volume method
Temporary (or permanent) sediment or wet detention basin providing 3,600 cubic feet of storage per acre drained

temporary (or permanent) sediment or wet detention basin providing 3,600 cubic feet of storage per acre drained must be provided

Chapter 3, Page 103

Peak flow calculation method(s)
Not found in document

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Temporary BMPs for Erosion and Sedimentation Control, BMPs—Vegetation for Erosion Control, BMPs for Dewatering

Chapter 3: Temporary BMPs for Erosion and Sedimentation Control ... Chapter 4: BMPs—Vegetation for Erosion Control ... Chapter 5: BMPs for Dewatering

Contents