Stormwater Atlas

City of Cape Coral

Utility Standards — Design Procedures Manual (Volume 1 of 4)

CityFloridalowNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Utilities conveyance standards only; full Engineering Design Standards Section L PDF was 404 — replace when available.

Fields not found in document: design_criteria.design_storm_return_periods_years, design_criteria.required_hydrologic_hydraulic_software

Document Metadata

Jurisdiction level
City

“CITY OF CAPE CORAL”

Cover

State
Florida

“Cape Coral, FL”

Cover

Version / edition
Adopted August 17, 2022

“ADOPTED AUGUST 17, 2022”

Cover

Adoption / effective date
2022-08-17

“AUGUST 17, 2022”

Cover

Last revised date
2022-08-17

“AUGUST 17, 2022”

Cover

Relationship to state manual
independent

“City Utility Standards / Engineering Design Standards referenced”

Introduction

Design Criteria

Design storm return periods (years)
Not found in document

No evidence cited

Water quality volume method
Section 9 Storm Water Systems covers storm drain size/slope/depth, catch basins, and outfalls for utility infrastructure. Broader drainage design standards historically in Engineering Design Standards Section L (PDF currently 404); this utilities manual is conveyance-focused rather than full post-construction WQv criteria.

“SECTION 9 - STORM WATER SYSTEMS”

Section 9

Peak flow calculation method(s)
Storm drain sizing criteria (Section 9.1–9.3), Catch basin type and placement standards, Outfall design requirements

“9.1 STORM DRAIN SIZE / 9.2 STORM DRAIN SLOPE”

Section 9

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Storm drains / storm sewers, Catch basins / inlets, Outfalls

“CATCH BASINS / OUTFALLS”

9.4–9.6