Stormwater Atlas

City of Winston-Salem

Infrastructure Development Standards (Winston-Salem / Forsyth County)

CityNorth CarolinalowNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

IDS is process/infrastructure-heavy; numeric post-construction criteria live mainly in Chapter 75 ordinance + NCDEQ manual. Consider supplementing with ordinance PDF later. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: document_metadata.adoption_or_effective_date, design_criteria.design_storm_return_periods_years, design_criteria.required_hydrologic_hydraulic_software, document_metadata.last_revised_date

Document Metadata

Jurisdiction level
City

City of Winston Salem

Standards apply

State
North Carolina

properties shall be coordinated with NCDEQ to determine the presence of wetlands and/or jurisdictional waters prior to final approval. COMPLETENESS CERTIFICATION: I, , PE have reviewed the attached plans prepared under my supervision. Furthermore, I certify that they, along wi

p. 25

Version / edition
2020 (Revised April 2020)

2020 Revised April 2020

Filename / cover

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
adopts state manual directly

most current standards of the Land Quality Section of the NCDEQ

Checklist

Design Criteria

Design storm return periods (years)
Not found in document

No evidence cited

Water quality volume method
Stormwater management and permitting administered under City Code Chapter 75 with NCDEQ Stormwater Design Manual MDC (85% TSS SCMs; first-inch / 1-year rate criteria commonly applied per city post-construction permit process). Infrastructure Development Standards cover storm drain systems and stormwater management process (Sections IV / VI / VII).

C. STORMWATER MANAGEMENT

Section IV-14

Peak flow calculation method(s)
Storm drain system design standards (Section IV), Stormwater management permitting process, NCDEQ Land Quality / stormwater standards coordination

Storm Drain System

Section IV-5

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
NCDEQ-approved SCMs (85% TSS), Storm drain systems, Post-construction stormwater management facilities

Stormwater Management Permit / NCDEQ

Section VI / checklist