North Carolina Department of Environmental Quality (NCDEQ)
NCDEQ Stormwater Design Manual — C-0. Minimum Design Criteria for all SCMs
This extraction needs human review.
Source is chapter C-0 only (MDC for all SCMs) of the multi-PDF NCDEQ Stormwater Design Manual. Required storm depth and SCM-specific MDC live in other parts/rules; this chapter states general sizing, outlet 10-year peak erosion protection, and lists example infiltrating SCM types. Peak-flow calculation methods and required software are not specified here (volume methods referred to Part B).
Document Metadata
“Rule 15A NCAC 2H .1050. MDC for All Stormwater Control Measures”
Important Links, Page 1
“NCDEQ Stormwater BMP Manual”
Header
“C-0. MDC for all SCMs 1 Revised: 1-3-2017”
Page header
“Revised: 1-3-2017”
Page header
“Revised: 1-3-2017”
Page header
“This chapter contains Minimum Design Criteria (MDC) that apply to all Stormwater Control Measures (SCMs)... See Part C of this Manual for SCM-specific requirements.”
Design Objective, Page 1
Design Criteria
“The outlets of SCMs shall be designed so that they do not cause erosion immediately downslope of the discharge point during the peak flow from the 10-year storm event as shown by engineering calculations.”
GENERAL MDC 4: EROSION PROTECTION, Page 3
“The combined design volume of all SCMs on the project shall be sufficient to handle the required storm depth... Rule 15A NCAC 02H .1021(6) requires that for projects designed to achieve runoff treatment, the required storm depth is one inch for non-coastal HQW and ORW management zones.”
GENERAL MDC 1. SIZING, Page 2
No evidence cited
No evidence cited
“Some SCMs that allow water to infiltrate include: infiltration systems, bioretention cells, permeable pavement, and depending upon native soils, vegetated swales, level spreader-filter strips, and berms.”
GENERAL MDC 2: CONTAMINATED SOILS, Page 2