Stormwater Atlas

City of Raleigh

Stormwater Design Manual

CityNorth CarolinamediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Raleigh SDM effective Nov 2, 2024; adopts/modifies NCDEQ SCM guidance. Confirm exact return-period list from hydrology chapter. Pipeline excerpt repair removed 5 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.version_or_edition, document_metadata.adoption_or_effective_date, document_metadata.last_revised_date, design_criteria.water_quality_volume_method, design_criteria.peak_flow_calculation_method

Document Metadata

Jurisdiction level
City

“City of Raleigh”

Title

State
North Carolina

“North Carolina”

Title

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

“NCDEQ SCM Design Manual”

References

Design Criteria

Design storm return periods (years)
1-year, 2-year, 10-year, 25-year, 100-year

“design storms / peak rate”

Design criteria

Water quality volume method
Not found in document

No evidence cited

Peak flow calculation method(s)
Not found in document

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Stormwater Control Measures (SCMs), Bioretention, Wet ponds, Detention, Other NCDEQ-approved SCMs

“Stormwater Control Measures”

SCM chapters