City of Raleigh
Stormwater Design Manual
CityNorth CarolinamediumNeeds reviewCitations verified
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Raleigh SDM effective Nov 2, 2024; adopts/modifies NCDEQ SCM guidance. Confirm exact return-period list from hydrology chapter. Pipeline excerpt repair removed 5 unlocated citation(s).
Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.version_or_edition, document_metadata.adoption_or_effective_date, document_metadata.last_revised_date, design_criteria.water_quality_volume_method, design_criteria.peak_flow_calculation_method
Other manuals in North Carolina: Charlotte-Mecklenburg, City of Asheville, City of Concord, City of Durham, City of Gastonia, City of Greensboro, City of High Point, City of Wilmington, City of Winston-Salem, North Carolina Department of Environmental Quality (NCDEQ), North Carolina Department of Transportation (NCDOT), Town of Cary
Document Metadata
Jurisdiction level
City
“City of Raleigh”
Title
State
North Carolina
“North Carolina”
Title
Version / edition
Not found in document
No evidence cited
Adoption / effective date
Not found in document
No evidence cited
Last revised date
Not found in document
No evidence cited
Relationship to state manual
independent
“NCDEQ SCM Design Manual”
References
Design Criteria
Design storm return periods (years)
1-year, 2-year, 10-year, 25-year, 100-year
“design storms / peak rate”
Design criteria
Water quality volume method
Not found in document
No evidence cited
Peak flow calculation method(s)
Not found in document
No evidence cited
Hydrologic/hydraulic software
Not found in document
No evidence cited
Approved BMP categories
Stormwater Control Measures (SCMs), Bioretention, Wet ponds, Detention, Other NCDEQ-approved SCMs
“Stormwater Control Measures”
SCM chapters