Stormwater Atlas

Town of Cary

NCDEQ Stormwater Design Manual (Town uses State MDC; LDO 4.4.6)

CityDEP / DEQNorth CarolinamediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Cary adopts NCDEQ Stormwater Design Manual MDC for SCM design; local LDO/engineering details not separately ingested. Pipeline excerpt repair removed 4 unlocated citation(s).

Fields not found in document: design_criteria.peak_flow_calculation_method, design_criteria.required_hydrologic_hydraulic_software, document_metadata.jurisdiction_level, document_metadata.adoption_or_effective_date, document_metadata.last_revised_date, document_metadata.relationship_to_state_manual

Document Metadata

Jurisdiction level
Not found in document

No evidence cited

State
North Carolina

North Carolina

NCDEQ

Version / edition
Revised: 1-3-2017

Revised: 1-3-2017

C-0

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
Not found in document

No evidence cited

Design Criteria

Design storm return periods (years)
10-year

The outlets of SCMs shall be designed so that they do not cause erosion immediately downslope of the discharge point during the peak flow from the 10-year storm event as shown by engineering calculations.

GENERAL MDC 4: EROSION PROTECTION, Page 3

Water quality volume method
Combined design volume of all SCMs must handle the required storm depth for the applicable stormwater program (depth varies by rule). Example: Rule 15A NCAC 02H .1021(6) requires a one-inch storm depth for runoff treatment in non-coastal HQW and ORW management zones. Design volume accounts for build-out runoff from all surfaces draining to the system; off-site drainage may be bypassed. Volume calculation methods are in Part B of the full manual (not in this chapter).

The combined design volume of all SCMs on the project shall be sufficient to handle the required storm depth... Rule 15A NCAC 02H .1021(6) requires that for projects designed to achieve runoff treatment, the required storm depth is one inch for non-coastal HQW and ORW management zones.

GENERAL MDC 1. SIZING, Page 2

Peak flow calculation method(s)
Not found in document

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Infiltration systems, Bioretention cells, Permeable pavement, Vegetated swales, Level spreader-filter strips, Berms, SCM-specific devices per Rules 15A NCAC 02H .1051–.1062 (Part C)

Some SCMs that allow water to infiltrate include: infiltration systems, bioretention cells, permeable pavement, and depending upon native soils, vegetated swales, level spreader-filter strips, and berms.

GENERAL MDC 2: CONTAMINATED SOILS, Page 2