Charlotte-Mecklenburg Stormwater Design Manual
This extraction needs human review.
April 2026 public-comment draft (Certification of Adoption not yet published). Manual covers conveyance design (hydrology, channels, pipes, culverts, energy dissipators); post-construction water quality volume / SCM sizing is deferred to separate Post Construction Stormwater Ordinances/Regulations referenced in §1.7—not specified in this text. Software listed is City verification tooling; designers may use any method-based tools.
Document Metadata
“This manual has been developed to assist in the design and evaluation of stormwater management facilities in the City of Charlotte, Charlotte ETJ, and Mecklenburg County.”
Chapter 1, Section 1.1, Page 6
“Figure 1-2. Stormwater conveyance structures in Charlotte, NC”
Chapter 1, Page 9
“April 2026”
Title Page
“A Certification of Adoption will be added when the final Design Manual is published.”
Certification of Adoption, Page 1
“The goals of the 2026 update to this manual are to”
Chapter 1, Section 1.2, Page 7
“Streamline information by focusing on City of Charlotte, Charlotte ETJ, and Mecklenburg County requirements”
Chapter 1, Section 1.2, Page 7
Design Criteria
“Table 2-1. Summary of design storm requirements... Channels ... 10-yr ... At sags on local streets 25-yr ... At sags on arterials and primary access streets 50-yr ... Primary access streets 100-yr ... Streets across regulated floodways 100-yr, 24-hr per FEMA”
Chapter 2, Table 2-1, Page 10
No evidence cited
“Either the Rational Method or the NRCS Method may be applied, with watershed sizes, appropriate applications, and necessary adjustments detailed in the table below.”
Chapter 2, Section 2.4, Page 11
“The City will typically use HEC software to verify designs submitted by the development community. In addition, the City may check designs using HydroCAD and StormCAD. Designers may use any software tools that are based on the methods described in this manual.”
Chapter 1, Section 1.3, Page 7
“Use vegetated channels whenever feasible • Implement armored channels only when a vegetated channel is not feasible”
Chapter 3, Table 3-1, Page 20