North Carolina Department of Transportation (NCDOT)
Guidelines for Drainage Studies and Hydraulic Design
StateDOTNorth CarolinamediumNeeds reviewCitations verified
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Heuristic agency extract from prepared text. NCDOT Guidelines for Drainage Studies and Hydraulic Design (2022 archived PDF; live guidance is web-based)
Fields not found in document: design_criteria.water_quality_volume_method
Document Metadata
Jurisdiction level
State
No evidence cited
State
North Carolina
No evidence cited
Version / edition
2022
No evidence cited
Adoption / effective date
Not found in document
No evidence cited
Last revised date
Not found in document
No evidence cited
Relationship to state manual
independent
No evidence cited
Design Criteria
Design storm return periods (years)
25-year, 50-year
“the roadway shoulder of two feet for a 50-year impoundment level; • A means of draining the lake completely will be provided.”
Water quality volume method
Not found in document
No evidence cited
Peak flow calculation method(s)
Rational Method, HEC-RAS
“ations for future urbanization values o Rational Method ‘c’ values o design frequencies for different facility types • Pipes o a”
Hydrologic/hydraulic software
HEC-RAS
No evidence cited
Approved BMP categories
Filter Strip
“Filter Strip”