submittals
Plan Submittal, Review, and Variances
Documentation expected for approval and paths for alternatives.
Practice
Plan-review packages typically include a drainage report, plans and details, calculation sheets or model files, an O&M plan, and as-built or certification materials. Local agencies add checklists; digital submittal expectations are increasing but inconsistent.
Plan-review package checklist
Draft national guidance grounded in atlas practice — not a design manual or adopted regulation.
| Deliverable | Suggested national guidance | Atlas note |
|---|---|---|
| Drainage report | Cover hydrology, WQv, SCM selection/sizing, and downstream impacts | Nearly universal plan-review expectation |
| Plans & details | Show drainage areas, SCM details, and maintenance access | Standard construction-document set |
| Model files | Include native input/output files and version disclosure | Increasingly required for digital review |
| O&M + as-builts | Include O&M plan and as-built/certification materials | Often tied to occupancy or bond release |
Guidance
Require a reproducible, reviewable package: drainage report covering hydrology, WQv, SCM selection and sizing, and downstream impacts; plans showing drainage areas, SCM details, and access; model input and output files; O&M plan; and as-built or certification materials. Provide a national checklist baseline and allow local agencies to add items.
Open questions
National checklist length versus deferral to local plan-review manuals. Digital submittal and model-file retention requirements.
References
Numbered footnotes for guidance clauses and atlas notes. Field-verified entries come from structured atlas evidence; corpus-pattern entries are keyword-matched excerpts.
“This stage includes several items that should be identified in the Final Design Submittal Complete- ness Checklist (plan review application and fees, project narrative, stormwater management and erosion and sediment control construction draw- ings,”
“Chicago Stormwater Ordinance Manual Appendix A A-1 Appendix A: Submittal Checklists The applicant should review this plan review checklist used by DOB. PLAN REVIEW CHECK LIST STORM SEWER AND SANITARY SEWER REQUIREMENTS: Ch II, 3.2.1”
“rdination with other local or state environmental permits) • Determine standard submittal requirements and develop plan review, construction and maintenance checklists to streamline project review • Determine the model for maintenance responsibility”
“val process when changes to an approved plan are desired. (3) A requirement for submittal of “as-built” certifications within 90 days of completion of a project. (4) A post-construction verification process to ensure that stormwater standards are be”
“Post-Construction Stormwater Management Plan Review Checklist Template Page 1 DATE RECEIVED CITY OF [NAME] [NAME OF DEPARTMENT, IF APPLICABLE] POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN REVIEW CHECKLIST NAME O”
“tormwater conveyance systems also require inspection and as-built certification submittal to and acceptance by the Stormwater Division in the City of Raleigh’s Engineering Services Department (Raleigh Stormwater) prior to final inspection approval a”
“rmwater control measures were retained for further consideration. Conduct a pre-submittal meeting with local• regulatory and plan review personnel to discuss green infrastructure and any atypical design elements. Prepare and submit site plans for ap”
“text font shall be “Simplex”. • All drawing units shall be English. D2-07.1(b) Submittals The AutoCAD files shall include all plans, profiles, notes, and details of the surface water improvements. All as-built sheets must be submitted both electron”
“_______________________________________ File Number: __________________ Date of Submittal: ____ Reviewer: ________________________ Review Date: ____ Project Meeting Chronology: _________________________ Type of Meeting: _________________________ Dat”
Supporting jurisdictions
9 jurisdictions cited in this section (outline tags ~75 manuals; full atlas has ~299).
ga-statechicago-ilak-statewest-virginia-manualbillings-mtraleigh-ncmissouri-manualbellevue-watn-state