Montana Post-Construction Storm Water BMP Design Guidance Manual
Document Metadata
“In cooperation with: Montana Department of Environmental Quality”
Title Page
“Montana’s General Permit for Storm Water Discharges Associated with Small Municipal Separate Storm Sewer Systems (MS4s): Permit Number MTR040000”
Section 1.1, Page 1-1
“First Edition September 2017”
Title Page
“September 2017”
Title Page
No evidence cited
“This manual is a guidance document... With the exception of referenced permit language, this manual does not convey requirements for storm water management practices in the state of Montana. However, it is expected that municipalities or other governing entities may adopt this manual”
Preface, Foreword
Design Criteria
“Generally, a 10- or 25-year return design storm is used to size storm drainage infrastructure and a 100-year return design storm is used to address upstream and downstream flooding”
Section 3.4 Flood Control, Page 3-4
“infiltrate, evapotranspire, and/or capture for reuse the post-construction runoff generated from the first 0.5 inches of rainfall from a 24-hour storm preceded by 48 hours of no measurable precipitation... remainder... remove 80 percent total suspended solids (TSS)”
Section 1.3.1, Pages 1-2 to 1-3
“This procedure relies on the volume of runoff computed using Equation 3-1 and uses an adaptation of the NRCS TR-55 Graphical Peak Discharge Method”
Section 3.3, Page 3-2
No evidence cited
“Infiltration Basin ... Bioretention ... Permeable Pavement Systems ... Dispersion ... Biofiltration Swale ... Extended Detention Basin ... Wet Detention Basin ... Proprietary Treatment Devices”
Contents, Chapter 5