City of Bellevue
Storm and Surface Water Engineering Standards
CityWashingtonhighNoCitations verified
Fields not found in document: design_criteria.design_storm_return_periods_years, design_criteria.required_hydrologic_hydraulic_software
Other manuals in Washington: City of Bellingham, City of Everett, City of Kennewick, City of Lacey, City of Olympia, City of Seattle, City of Seattle, City of Tacoma, City of Vancouver, King County, Spokane County / City of Spokane / City of Spokane Valley, Washington, Washington State Department of Transportation (WSDOT)
Document Metadata
Jurisdiction level
City
“CITY OF BELLEVUE”
Cover
State
Washington
“listed in Chapter D1-04 of this manual, including preparation of a stormwater site plan, control of site construction stormwater, source control, preservation of natural discharge location, wetland protection and operation and maintenance. Each of the seven steps is descr”
p. 16
Version / edition
January 2023
“January 2023”
Cover
Adoption / effective date
2023-01-01
“January 2023”
Cover
Last revised date
2023-01-01
“January 2023”
Cover
Relationship to state manual
deemed equivalent to state manual
“in accordance with the DOE Manual / Storm and Surface Water Utility Code Chapter 24.06”
D1-01.1
Design Criteria
Design storm return periods (years)
Not found in document
No evidence cited
Water quality volume method
Implements Ecology DOE Manual-aligned Minimum Requirements #1–#9 for new/redevelopment (site plans, construction SWPPP, source control, natural drainage, on-site stormwater management, runoff treatment, flow control, wetlands protection, O&M). Flow control and infiltration/detention facility standards in Chapters D6–D7; LID infeasibility criteria in appendices.
“MINIMUM REQUIREMENT #6 - RUNOFF TREATMENT / #5 - ON-SITE STORMWATER MANAGEMENT”
D1-04.2
Peak flow calculation method(s)
Minimum Requirement #7 Flow Control (duration matching per DOE Manual), Detention facility design standards, Infiltration system design / feasibility checklist, Flow control exemptions for Ecology-approved receiving waters
“MINIMUM REQUIREMENT #7 - FLOW CONTROL”
D1-04.2(G)
Hydrologic/hydraulic software
Not found in document
No evidence cited
Approved BMP categories
On-site stormwater management / LID BMPs, Runoff treatment BMPs, Flow control detention facilities, Infiltration systems
“FLOW CONTROL - DETENTION FACILITIES / INFILTRATION SYSTEMS”
D6 / D7