Pennsylvania Post-Construction Stormwater Management (PCSM) Manual
Document Metadata
“DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Clean Water”
Page i
“Pennsylvania Department of Environmental Protection 400 Market Street, P.O. Box 8774 Harrisburg, PA 17105-8774”
Page ii
“386-0300-001 / January 28, 2023 / DRAFT”
Page i
“EFFECTIVE DATE: Upon publication of notice as final in the Pennsylvania Bulletin.”
Page i
“386-0300-001 / January 28, 2023 / DRAFT”
Page i
“This Pennsylvania Post-Construction Stormwater Management Manual (PCSM Manual or Manual) was developed to update and replace the Pennsylvania Stormwater Best Management Practices Manual (363-0300-002) that was published by the Pennsylvania Department of Environmental Protection (DEP) in December 2006”
Page 1-1
Design Criteria
“manage the net change in peak rate for the 2-, 10-, 50-, and 100-year/24-hour storm events in a manner not to exceed preconstruction rates”
Page 2-37
“Water quality is addressed in this Manual through a pollutant load approach, coupling volume and WQM. First, statistically derived land cover-based pollutant concentrations are applied to runoff from existing and proposed site conditions. Second, volume reductions through SCMs are taken into account. Finally, post-construction pollutant loads are evaluated based on SCM effluent (outflow) pollutant concentration data from accepted data sources such as the National Stormwater Quality Database and the International Stormwater BMP Database, and compared to pre-construction pollutant loads.”
Page 1-18
“Methods include the NRCS hydrologic soil-cover complex method, Green and Ampt equation, Snyder Unit Hydrograph, and WINSLAMM small storm hydrology method.”
Page 2-53
“HEC-RAS, International River Interface Cooperative (iRIC), or other software capable of performing a sediment transport analysis.”
Page 2-65
“A.1 Protect and Preserve Natural Landscape Processes A.2 Enhanced Natural Landscape SCMs B.1 Infiltration-Based SCMs B.2 Non-Infiltration SCMs Managed Release Concept Rate Control SCMs”
Page 3-4, Table 3-1