City of Lancaster
City of Lancaster Green Infrastructure Design Manual
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Extracted from City of Lancaster GI Design Manual Final June 2024 PDF. Companion fee/credit policy: lancaster-pa-swmf (SWMF Policies and Procedures Manual, amended Feb 2023).
Document Metadata
No evidence cited
No evidence cited
“Revisions to support adoption of the City's updated 2022 Stormwater Management Ordinance — October 2023 (draft) June 2024 (final)”
Revision history
No evidence cited
No evidence cited
No evidence cited
Design Criteria
“For the 2, 10, 25, 50, and 100-year storm events, the post-development peak discharge rates will follow the applicable release rate map. (SWM Ordinance §260-304.B).”
Section 2.3.2 Rate Control
“At least the first one and a quarter inch (1.25") of runoff from new impervious surfaces shall be permanently removed from the runoff flow, that is, it shall not be released into the surface Waters of the Commonwealth or Combined Sewer System. Removal options include reuse, evaporation, transpiration and infiltration.”
Section 2.3.1 Volume Control
“The NRCS Curve Number Method is the preferred method used to estimate site stormwater runoff from a given storm. ... project sites less than 25 acres may be sized for capacity using the Rational Method.”
Chapter 4 Methodology
No evidence cited
“This includes bioretention, porous pavement, green roofs, cisterns for reuse, naturalized basins and stormwater wetlands.”
Chapter 3 / Chapter 5 BMP guidance