Pennsylvania
Pennsylvania Stormwater Best Management Practices Manual
Document Metadata
No evidence cited
No evidence cited
“363-0300-002 / December 30, 2006”
Title Page
“EFFECTIVE DATE: December 30, 2006”
Page i
No evidence cited
No evidence cited
Design Criteria
“Do not increase the post-development total runoff volume for all storms equal to or less than the 2-year/24-hour event.”
Chapter 3, Section 3.3.3 Volume Control Guideline 1
“Stormwater facilities shall be sized to capture at least the first two inches (2") of runoff from all contributing impervious surfaces. At least the first one inch (1.0") of runoff from new impervious surfaces shall be permanently removed from the runoff flow”
Chapter 3, Section 3.3.4 Volume Control Guideline 2
“8.3.1 The Rational Method ... 8.3.2 SCS (NRCS) Unit Hydrograph Method”
Chapter 8 Table of Contents
“8.4.2 SCS/NRCS Models: WIN TR-20 and WIN TR-55 ... 8.4.4 Storm Water Management Model (SWMM)”
Chapter 8 Table of Contents
“6.4 Volume/Peak Rate Reduction by Infiltration BMPs ... 6.5 Volume/Peak Rate Reduction BMPs ... 6.6 Runoff Quality/Peak Rate BMPs”
Chapter 6 Table of Contents