Tennessee
TDOT Drainage Manual Chapter 7
StateDOTTennesseemediumNeeds reviewCitations verified
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Heuristic agency extract from prepared text. TDOT Drainage Manual Chapter 7 — Storm Drainage Systems Pipeline excerpt repair removed 1 unlocated citation(s).
Fields not found in document: design_criteria.water_quality_volume_method, design_criteria.required_hydrologic_hydraulic_software, design_criteria.approved_bmp_categories, document_metadata.jurisdiction_name
Document Metadata
Jurisdiction level
State
No evidence cited
State
Tennessee
No evidence cited
Version / edition
Not found in document
No evidence cited
Adoption / effective date
Not found in document
No evidence cited
Last revised date
Not found in document
No evidence cited
Relationship to state manual
independent
No evidence cited
Design Criteria
Design storm return periods (years)
10-year, 50-year
“quency Criteria See Section Gutter Flow 10-year1,2 Spread on Roadway 7.03.2 Inlet Spacing 10-year1,2 Spread on Roadway 7.03.3.7”
Water quality volume method
Not found in document
No evidence cited
Peak flow calculation method(s)
Rational Method
“gutter is typically evaluated using the Rational Method (see Chapter 4 of this Manual) and the spread is determined by examining”
Hydrologic/hydraulic software
Not found in document
No evidence cited
Approved BMP categories
Not found in document
No evidence cited