Metropolitan Nashville and Davidson County
Stormwater Management Manual Volume 4 – Best Management Practices
This extraction needs human review.
Source text is Volume 4 Section 1 introduction only (BMP selection overview). No numeric design-storm return periods, peak-flow calculation methods, or required software appear in this excerpt; hydrologic/design criteria live in other SWMM volumes/sections (e.g., Volumes 1–3 and BMP fact sheets). Re-extract when full Vol4 BMP fact sheets or Procedures/Theory volumes are available.
Document Metadata
“for each type of BMP to be used in the Metropolitan Nashville and Davidson County (Metro) area”
Section 1.1, Page 1-1
“National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) permit issued by the Tennessee Department of Environment and Conservation (TDEC)”
Section 1.1, Page 1-1
“Volume 4 – Best Management Practices 2021”
Section 1 cover, Page 1-1
“Volume 4 – Best Management Practices 2021... Any future release of this manual supersedes any and all previous manual releases. Each page is dated to indicate the release date.”
Section 1.1, Pages 1-1 to 1-2
“Volume 4 – Best Management Practices 2021”
Section 1 cover, Page 1-1
“It was prompted by requirements in Metropolitan Nashville and Davidson County’s National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) permit issued by the Tennessee Department of Environment and Conservation (TDEC).”
Section 1.1, Page 1-1
Design Criteria
No evidence cited
“Long-term BMP selection must be based upon the ability to meet Metro’s requirement of an 80% TSS reduction of an average annual urban pollutant load.”
Section 1.6.1, Page 1-9
No evidence cited
No evidence cited
“Temporary BMPs are intended to address construction activities while permanent BMPs address long-term stormwater management objectives / requirements.... Permanent BMPs may include swales, sediment or detention ponds, and a variety of other features.”
Section 1.5, Pages 1-7 to 1-8