City of Murfreesboro
Stormwater Planning & Low Impact Design Guide
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Primary planning/LID guide (Apr 2008). Structural Controls Manual is published as separate CivicPlus DocumentCenter sections. Pipeline excerpt repair removed 1 unlocated citation(s).
Document Metadata
No evidence cited
No evidence cited
No evidence cited
No evidence cited
No evidence cited
“independent city LID / planning guide”
Coverage note
Design Criteria
“the full build-out 100year storm event is to be conveyed on-site such that no resulting habitable structural flooding occurs”
Table 1.2-1 Step 3
“WQv = 1.2 * Rv * A / 12 ... 1.2 inches of rainfall has been identified as the average depth corresponding to the 85th percentile storm for the Middle Tennessee region”
§1.2.2.1
“Provide on-site controlled release of the 3.1” storm event over a period of 24 hours (Streambank Protection Volume, SPV)”
Table 1.2-1 Step 2
No evidence cited
No evidence cited