Wisconsin
WisDOT FDM Chapter 13 Drainage
StateDOTWisconsinmediumNeeds reviewCitations verified
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Heuristic agency extract from prepared text. WisDOT FDM Chapter 13 Drainage — Section 13-10 Hydrology Pipeline excerpt repair removed 1 unlocated citation(s).
Fields not found in document: design_criteria.water_quality_volume_method, document_metadata.jurisdiction_name
Other manuals in Wisconsin: City of Madison, Milwaukee Metropolitan Sewerage District, Wisconsin Department of Natural Resources
Document Metadata
Jurisdiction level
State
No evidence cited
State
Wisconsin
No evidence cited
Version / edition
Not found in document
No evidence cited
Adoption / effective date
Not found in document
No evidence cited
Last revised date
Not found in document
No evidence cited
Relationship to state manual
independent
No evidence cited
Design Criteria
Design storm return periods (years)
2-year, 5-year, 10-year, 25-year, 50-year, 100-year, 500-year
“there is a 0.01 percent chance that two 100-year events can happen in back-to- back years. Since the actual time between occurre”
Water quality volume method
Not found in document
No evidence cited
Peak flow calculation method(s)
Rational Method, NRCS / SCS Curve Number (TR-55), TR-20, HEC-HMS
“inate with municipalities during the operational planning meeting or otherwise to inquire if new development is pending adjacent”
Hydrologic/hydraulic software
HydroCAD, HEC-HMS
No evidence cited
Approved BMP categories
Detention Basin
“Detention Basin”