City of Madison
Madison General Ordinances Chapter 37 — Public Stormwater System including Erosion Control (ORD-25-00017 amendments)
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Ordinance amendment PDF rather than standalone design manual; design criteria live in Ch. 37 text. DSC webpage also cites 1–200yr rate control for large new impervious. Pipeline excerpt repair removed 2 unlocated citation(s).
Document Metadata
“City of Madison”
Ordinance
No evidence cited
“ORD-25-00017”
Ordinance
“These changes will go into effect on April 1, 2025.”
Drafter analysis / §31
“Date: March 17, 2025”
Ordinance file path
No evidence cited
Design Criteria
“10-year / 100-year / 500-year storm event”
Design standards
“peak detention, infiltration and Total Suspended Solids (TSS)”
Drafter analysis
“convey the runoff that would drain from upstream lands during the 10-year storm event”
Design standards
No evidence cited
“Green Infrastructure / infiltration basins”
Definitions / standards