Stormwater Atlas

Wisconsin Department of Natural Resources

Wet Detention Pond (1001) — WDNR Technical Standard

StateDEP / DEQWisconsinmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Narrow WDNR Technical Standard 1001 for wet detention ponds only — not a full statewide stormwater design manual. Explicitly excludes flood-control design; local authorities may require peak control beyond the 2-yr, 24-hour storm. SLAMM/P8/DETPOND are approved optional models, not mandated for every design. Companion standards (1002–1004, 1064) and NR 151 govern broader post-construction requirements. Pipeline excerpt repair removed 9 unlocated citation(s).

Fields not found in document: design_criteria.approved_bmp_categories (beyond wet detention pond — this standard covers only one practice), document_metadata.jurisdiction_level, document_metadata.version_or_edition, document_metadata.adoption_or_effective_date, document_metadata.last_revised_date, design_criteria.water_quality_volume_method, design_criteria.peak_flow_calculation_method, design_criteria.required_hydrologic_hydraulic_software, design_criteria.approved_bmp_categories

Document Metadata

Jurisdiction level
Not found in document

No evidence cited

State
Wisconsin

Wisconsin Department of Natural Resources

Page 1

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

Wisconsin Department of Natural Resources Technical Standard

Page 1

Design Criteria

Design storm return periods (years)
1-year, 2-year, 10-year, 100-year

the elevation reached by the 2-yr., 24-hour storm event. E. For synthetic liners, follow the manufacturers’ recommendations for installation.

p. 17

Water quality volume method
Not found in document

States Department of Agriculture, Natural Resources Conservation Service, Washington, D.C. 1986. NRCS Bulletin No. WI-210-8-16 (Sept. 12, 1988) amended the TR-55 routing graph for Type II storms to include flows outside the original range.

p. 11

Peak flow calculation method(s)
Not found in document

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Not found in document

No evidence cited