Stormwater Atlas

Washington State Department of Transportation (WSDOT)

Highway Runoff Manual M 31-16 — Chapter 3 Minimum Requirements

StateDOTWashingtonmediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Heuristic agency extract from prepared text. WSDOT Highway Runoff Manual Ch3 Minimum Requirements (2014). Full HRM PDF ~240MB deferred.

Fields not found in document: design_criteria.peak_flow_calculation_method, design_criteria.water_quality_volume_method, design_criteria.required_hydrologic_hydraulic_software, design_criteria.approved_bmp_categories

Document Metadata

Jurisdiction level
State

No evidence cited

State
Washington

No evidence cited

Version / edition
April 2014 (M 31-16.04)

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

No evidence cited

Design Criteria

Design storm return periods (years)
2-year, 25-year, 50-year, 100-year

auses a 0.1 cfs or more increase in the 100-year recurrence interval flow? Chapter 3 Minimum Requirements WSDOT Highway Runoff M

Water quality volume method
Not found in document

No evidence cited

Peak flow calculation method(s)
Not found in document

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Not found in document

No evidence cited