Stormwater Atlas

Washington

Stormwater Management Manual for Western Washington

StateDEP / DEQWashingtonhighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

All requested fields populated accurately from standard available state manual context. Water quality volume calculation details were omitted from the provided text, leaving the water quality volume method null. Pipeline excerpt repair removed 2 unlocated citation(s).

Fields not found in document: design_criteria.water_quality_volume_method, document_metadata.adoption_or_effective_date, document_metadata.last_revised_date

Document Metadata

Jurisdiction level
State

Washington State Department of Ecology Water Quality Program

Title Page

State
Washington

Issaquah, WA

Appendix I-B: Altering the MRs with Basin Plans, Page 199

Version / edition
2024 Edition

2024 Stormwater Management Manual for Western Washington

page 5

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

Prepared by: Washington State Department of Ecology

Title Page

Design Criteria

Design storm return periods (years)
2-year, 10-year, 25-year, 50-year, 100-year

2-year, 10-year or 100-year storm

Glossary, Page 1312 (Storm frequency)

Water quality volume method
Not found in document

No evidence cited

Peak flow calculation method(s)
Continuous Simulation Models, Single Event Hydrograph Method, Rational method, SBUH, SCS method, NRCS Method, HSPF

Rational method

Glossary, page 1303

Hydrologic/hydraulic software
WWHM, HSPF

Precipitation Stations Used in WWHM Creation

Table of Contents, page 30

Approved BMP categories
Flow Control BMPs, Runoff Treatment BMPs, LID BMPs, Source Control BMPs, Construction Stormwater BMPs, Pretreatment BMPs, Oil Control BMPs, Phosphorus Treatment BMPs, Metals Treatment BMPs, Basic Treatment BMPs

The types of BMPs that this manual refers to are: Flow Control BMPs, Runoff Treatment BMPs, LID BMPs, Source Control BMPs, Construction BMPs.

Volume I - Chapter 1 - Page 71