Stormwater Atlas

Virginia Department of Transportation (VDOT)

VDOT Drainage Manual — Chapter 11 Stormwater Management

StateDOTVirginiamediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Heuristic agency extract from prepared text. VDOT Drainage Manual Chapter 11 Stormwater Management (July 2026). Full combined PDF ~161MB deferred.

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software

Document Metadata

Jurisdiction level
State

No evidence cited

State
Virginia

No evidence cited

Version / edition
July 2026

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

No evidence cited

Design Criteria

Design storm return periods (years)
2-year, 10-year, 100-year

lated sediment removed about every 5 to 10 years or as necessary based upon a SWMF inspection. Chapter 11-11 of 158 11.4 Part V

Water quality volume method
Water Quality Volume Computation and BMP Selection Procedure

Water Quality Volume Computation and BMP Selection Procedure

Peak flow calculation method(s)
Rational Method, NRCS / SCS Curve Number (TR-55), TR-20, Modified Rational Method

............. 11-80 11.5.7.1.1 Modified Rational Method, Simplified Triangular Hydrograph ................. 11-80 Routing ......

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Bioretention, Wet Pond, Extended Detention, Filter Strip, Permeable Pavement, Constructed Wetland, Detention Basin

Bioretention, Wet Pond, Extended Detention, Filter Strip