Virginia Department of Environmental Quality (DEQ)
Virginia Stormwater Management Handbook, Chapter 8 — BMP Overview and Selection Criteria
This extraction needs human review.
Chapter 8 only (July 2013 clearinghouse PDF) — BMP overview/selection, not the full Virginia Stormwater Management Handbook (EncodePlus). Treatment Volume (first 1-inch) and 1-year/24-hour channel protection are stated here; detailed hydrologic/peak-flow calculation methods and required software live in other handbook chapters and are not in this excerpt. 100-year appears mainly for floodplain setbacks and optional enlarged volume-reduction BMPs, not as a complete flood-control design chapter.
Document Metadata
“Virginia Stormwater Management Handbook, Chapter 8 July 2013”
Header throughout
“Virginia Stormwater Management Handbook”
Header
“Virginia Stormwater Management Handbook, Chapter 8 July 2013”
Header
“July 2013”
Header
“July 2013”
Header
“Virginia Stormwater Management Handbook, Chapter 8... Complete standards and specifications for Virginia-approved post-construction BMPs and MTDs can be found on the Virginia BMP Clearinghouse web site”
Header; Section 8.3, Page 8-41
Design Criteria
“In Virginia, control of the 1-year 24-hour storm volume is considered the standard necessary to protect stream channel geomorphology”
Section 8.1.9, Page 8-11
“Generally, runoff volume reduction BMPs are designed to handle at least the Treatment Volume from impervious surfaces (first 1-inch of rainfall).”
Section 8.1.9, Page 8-11
No evidence cited
No evidence cited
“8.2.2. Approved Virginia Non-Proprietary Stormwater Control Measures... Runoff volume reduction... Swales or open channels... Filtering systems... Infiltration practices... Basins”
Section 8.2.2, Page 8-32