Stormwater Atlas

City of Rockford

Stormwater Technical Guidance Manual

CityIllinoismediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

May 2015 edition; quantity-focused release-rate standard with BMP hierarchy.

Document Metadata

Jurisdiction level
City

No evidence cited

State
Illinois

No evidence cited

Version / edition
May 18, 2015

May 18, 2015

Cover

Adoption / effective date
2015-05-18

No evidence cited

Last revised date
2015-05-18

No evidence cited

Relationship to state manual
independent

independent city technical manual (supplements Stormwater Ordinance)

Introduction

Design Criteria

Design storm return periods (years)
1-year, 2-year, 5-year, 10-year, 25-year, 50-year, 100-year

minor system criteria (typically 10-year) ... major system criteria (the 100-year) ... Bulletin 70

T2-02 / Table 1

Water quality volume method
Peak release rate from a development site shall not exceed 0.2 cfs/acre for the 100-year (0.01 AEP) storm. Minor system typically 10-year; major system 100-year. Design rainfall from Illinois State Water Survey Bulletin 70 Northwest sectional statistics. BMPs required for water quality; Illinois Urban Manual referenced for practice design.

The peak release rate from a development site shall not exceed 0.2 cfs/acre of development for the 0.01 probability in any year

T2-03(b)

Peak flow calculation method(s)
HEC-HMS / HEC-1 (SCS runoff), SWMM, TR-20, TR-55 tabular method, Bulletin 70 critical-duration storms

HEC-HMS, HEC-1 with SCS runoff method, SWMM, TR-20, and TR-55 tabular

T2-02(e)

Hydrologic/hydraulic software
HEC-HMS, HEC-1, SWMM, TR-20, TR-55

No evidence cited

Approved BMP categories
Site runoff storage / detention, Overland flow paths, Best Management Practices hierarchy (avoidance → LID → structural), Illinois Urban Manual practices

No evidence cited