Stormwater Atlas

Town of Prescott Valley

Uniform Drainage Policies and Standards Manual

CityArizonahighNoVerify pending
Fields not found in document: document_metadata.version_or_edition, document_metadata.adoption_or_effective_date, document_metadata.issuing_agency_category

Document Metadata

Jurisdiction level
City

No evidence cited

State
Arizona

No evidence cited

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
2025-02-10

WEST Consultants, Inc. 10 10-Feb-25

page 21

Relationship to state manual
independent

The hydrology for the Town is based on the methods in the Drainage Design Manual for Yavapai County (Yavapai County, 2015).

Section 6.3, page 69

Design Criteria

Design storm return periods (years)
2-year, 10-year, 25-year, 50-year, 100-year

Post-development peak discharges may not exceed pre-development peak discharges for the 2-, 10-, and 100-year storm events for the design of detention basins.

Standard 6.9.3, page 164

Water quality volume method
First flush: retain or treat the first 0.5 inches of direct runoff from a storm event; green infrastructure/LID in Appendix B may meet requirements if equivalent volume and performance are achieved.

The minimum level of control for new development at which stormwater pollution prevention practices must be put in place is called the “first flush.” This consists of retaining or treating the first 0.5 inches of direct runoff from a storm event.

Policy 3.5.6, page 29

Peak flow calculation method(s)
Hierarchy: Town Master Drainage Plan, ADMS/ADMPs, or approved flood insurance studies; then adjacent property drainage plans; otherwise procedures in this Manual (Section 6.3), Rational Method for peak discharges (areas ≤160 acres, Tc ≤60 min), Unit hydrograph method via HEC-HMS with 24-hour frequency storm (PFDS/Table 6-3); Green and Ampt rainfall losses for HMS

The following is the preferred order of hierarchy for obtaining peak discharges and runoff volumes

Policy 3.4.1, page 28

Hydrologic/hydraulic software
HEC-HMS (most recent version), HEC-RAS (most recent version), HY-8 (most recent version), EPA-SWMM (most recent version), FLO-2D (most recent version, or as approved by FEMA for an FIS study), XP Storm (most recent version, or as approved by FEMA for an FIS study)

1D Hydrology – HEC-HMS (most recent version) 1D Hydraulics – HEC-RAS (most recent version), HY-8 (most recent version), and EPA-SWMM (most recent version)

Section 6.12, page 175

Approved BMP categories
Best Management Practices (BMP), green infrastructure, low impact development, stormwater harvesting basins, sediment traps, curb openings, stormwater pollution prevention practices meeting first flush

Stormwater Pollution Prevention is to be addressed through the use of Best Management Practices (BMP) to the maximum extent practicable

Policy 3.5.5, page 29