Wayne County
Wayne County Stormwater Control Program — Standards Manual
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Pipeline excerpt repair removed 1 unlocated citation(s).
Document Metadata
“Wayne County”
Cover
No evidence cited
“September 2021”
Footer
“effective September 3, 2021”
Landing / cover program
“September 2021”
Footer
“Wayne County Stormwater Ordinance, Administrative Rules, and Standards Manual”
Introduction
Design Criteria
“100-year recurrence interval storm; 2-year recurrence interval storm”
Chapter 5
“remove 80 percent or more of the total suspended solids (TSS) load ... first one (1) inch of rainfall”
§5.2
“peak flow rate ... must not exceed 0.15 cfs/acre for a 100-year recurrence interval storm”
§5.1
No evidence cited
“Detention Basins; Underground Detention; Bioretention; Water Quality/Infiltration Systems”
Chapter 8 TOC