Michigan
Michigan Nonpoint Source Best Management Practices Manual
This extraction needs human review.
This PDF is Part 1 (introductory/background, 31 pages); individual BMP design specifications are published separately on the MDEQ BMP web page.
Document Metadata
“Michigan Department of Environmental Quality”
Title Page
“Michigan Nonpoint Source Best Management Practices Manual”
Title Page
“Rev 2017.6.27”
Title Page
“Rev 2017.6.27”
Title Page
“appropriate version number, based on the last revision date, placed in the lower right corner of each page”
Page 3, Foreword
“BMPs developed specifically for use in Michigan”
Page 11
Design Criteria
“storms of 24-hour duration, with AEPs of 99.9%, 50%, 20%, 10%, 4%, 2%, and 1%; the corresponding average recurrence intervals of these AEPs are one (1), two (2), five (5), 10, 25, 50, and 100 years”
Page 13, Hydrology
“Treatment of runoff produced by all storm events up to and including the 10 percent exceedance runoff-generating storm event... A conservative alternative is treatment of 1.0 inches of runoff over the entire site.”
Page 17, Unified Sizing Criteria
“The recommended hydrologic baseline condition used in this manual is the presettlement hydrology of the site... Channel Protection – Maintain the calculated presettlement runoff volume and peak flow rate for all storm events up to the 2-year, 24-hour event.”
Pages 13, 17
No evidence cited
“prevention/minimization, storage, treatment, conveyance, or mitigation”
Page 11, Storm Water BMPs