South Carolina
South Carolina Stormwater Management BMP Handbook (BMP Field Manual)
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Main BMPFieldManual.pdf text is not machine-readable (custom font encoding). Extraction used readable section PDFs from the SC DES BMP Handbook (Wet/Dry Detention Ponds, Structural Controls). Peak-flow software/method details not found in readable sections. Pipeline excerpt repair removed 2 unlocated citation(s).
Document Metadata
“South Carolina Department of Environmental Services”
BMP Handbook landing page
“construct across or along a stream to South Carolina Department of Environmental Services (SCDES). Temporary stream crossings require authorization. Refer to the US Army Corps of Engineers and SCDES nationwide 401 and 404 regulations for information on permit requirements. When”
pp. 106–107
No evidence cited
No evidence cited
No evidence cited
“SCDES BMP Handbook evaluates numerous Best Management Practices (BMPs)”
BMP Handbook landing page
Design Criteria
“Ponds shall be designed for the 2 and 10-year storms; The 100-year storm should not overtop the embankment”
Dry Detention Ponds
“design permanent pool volume is equal to 1-inch of runoff per impervious acre on the site”
Wet Detention Ponds
“Size the outlet structure for water quality control and water quantity control (based upon hydrologic”
Dry Detention Ponds
No evidence cited
“Structural storm water quality controls are classified into the following categories: General Application Controls ... Limited Application Controls”
Structural Controls p.117