South Carolina Stormwater Management BMP Handbook (BMP Field Manual)

StateDEP / DEQSouth CarolinamediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Main BMPFieldManual.pdf text is not machine-readable (custom font encoding). Extraction used readable section PDFs from the SC DES BMP Handbook (Wet/Dry Detention Ponds, Structural Controls). Peak-flow software/method details not found in readable sections. Pipeline excerpt repair removed 2 unlocated citation(s).

Fields not found in document: design_criteria.required_hydrologic_hydraulic_software, document_metadata.version_or_edition, document_metadata.last_revised_date

Document Metadata

Jurisdiction level
State

South Carolina Department of Environmental Services

BMP Handbook landing page

State
South Carolina

construct across or along a stream to South Carolina Department of Environmental Services (SCDES). Temporary stream crossings require authorization. Refer to the US Army Corps of Engineers and SCDES nationwide 401 and 404 regulations for information on permit requirements. When

pp. 106–107

Version / edition
Not found in document

No evidence cited

Adoption / effective date
Not found in document

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

SCDES BMP Handbook evaluates numerous Best Management Practices (BMPs)

BMP Handbook landing page

Design Criteria

Design storm return periods (years)
1-year, 2-year, 10-year, 100-year

Ponds shall be designed for the 2 and 10-year storms; The 100-year storm should not overtop the embankment

Dry Detention Ponds

Water quality volume method
Wet detention ponds: permanent pool volume equals 1 inch of runoff per impervious acre (0.5 inch for wet extended ponds with aquatic bench; 0.1 inch for micropool extended ponds). Dry detention lower stage detains the water quality volume for at least 24 hours.

design permanent pool volume is equal to 1-inch of runoff per impervious acre on the site

Wet Detention Ponds

Peak flow calculation method(s)
Hydrologic analysis for outlet structure sizing (water quality and quantity control)

Size the outlet structure for water quality control and water quantity control (based upon hydrologic

Dry Detention Ponds

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Erosion Prevention BMPs, Sediment Control BMPs, Runoff Control and Conveyance BMPs, Low Impact Development (LID) BMPs, Structural Water Quality BMPs

Structural storm water quality controls are classified into the following categories: General Application Controls ... Limited Application Controls

Structural Controls p.117