City of Columbia
Best Management Practice (BMP) Design Manual
This extraction is flagged for quality review.
Compare each cited field to the official PDF before relying on it. What this means
Pipeline excerpt repair removed 3 unlocated citation(s).
Document Metadata
“City of Columbia”
Cover
“Columbia, South Carolina”
Cover
No evidence cited
No evidence cited
No evidence cited
“Georgia Stormwater Management Manual (GSMM) will also be utilized”
Ch. 1
Design Criteria
“Provide extended detention of the 1-year storm event released over a period of 24 hours to reduce bank-full flows and protect downstream channels from erosive velocities and unstable conditions. Overbank Flood Protection Provide peak discharge control of the 25-year storm e”
pp. 20–21
“treat at least the runoff from the entire site for a 1.2-inch rainfall event”
§1 Water Quality
“Channel Protection Volume ... 1-year storm; Overbank Flood Protection (Q25)”
Ch. 1–2
No evidence cited
“permanent water quality BMP ... pretreatment device such as a forebay”
§1 Water Quality