Kentucky
BMP Planning and Technical Specifications Manual for Construction Sites in Kentucky
This extraction needs human review.
This PDF is KYTC BMP Manual Section 1 only—focused on construction-site BMP planning and technical specifications rather than statewide post-construction hydrologic sizing; local programs (MSD, LFUCG) carry additional quantitative standards.
Document Metadata
“funding provided in part by a grant from the U.S. Environmental Protection Agency (EPA) through the Kentucky Division of Water (KDOW)”
Title Page
“Kentucky Division of Water”
Technical Review Committee
“KY BMP Manual Section 1”
Source filename
No evidence cited
No evidence cited
“The manual is consistent with other Kentucky state and local guides that contain information on controlling polluted runoff from construction sites”
Chapter 1, Introduction
Design Criteria
“All erosion protection and sediment control (EPSC) measures must be designed and installed to accomplish an 80 percent design removal efficiency goal for total suspended solids, using a 10-year, 24-hour storm event design.”
Chapter 2, Louisville-Jefferson County MSD
“Treatment.controls.can.include.infiltration.devices.or.sites,.filtration.devices,.and.retention.or.detention.facilities.”
Chapter 3, Section 3.3 Post-Construction Stormwater Management
“hydrologic and hydraulic analysis must be performed ... determines the expected 100-year flood heights and the delineation of the floodway”
Chapter 2, Section 2.6 Kentucky Floodplain Construction Permit
No evidence cited
“Silt Fence ... Sediment (Detention) Basins ... Buffer Zones ... Filter Strips ... Rock-Lined Ditches and Channels ... Grass-Lined Ditches and Channels”
Chapter 4 Table of Contents