Stormwater Atlas

Iowa

Iowa Storm Water Management Manual

StateDEP / DEQIowahighNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

The listed software are noted in the text as 'typical modeling programs' rather than explicitly 'required'. Version and last revised dates were not explicitly distinguished beyond the general publication date of October 28, 2009.

Fields not found in document: document_metadata.version_or_edition, document_metadata.last_revised_date

Document Metadata

Jurisdiction level
State

Iowa Storm Water Management Manual

Chapter 1- Section 1, Page 1 of 8

State
Iowa

The Nationwide Permit Program Fact Sheet No. 7 (IA)

Chapter 1- Section 3, Page 5 of 10

Version / edition
Not found in document

No evidence cited

Adoption / effective date
2009-10-28

October 28, 2009

Chapter 1- Section 1, Page 1 of 8

Last revised date
Not found in document

No evidence cited

Relationship to state manual
independent

Iowa Storm Water Management Manual

Chapter 1- Section 1, Page 1 of 8

Design Criteria

Design storm return periods (years)
1-year, 2-year, 5-year, 10-year, 25-year, 50-year, 100-year

a. Extended detention of the 1-year, 24-hour storm for a period of 24 hours using structural stormwater controls. It is known that the increase in runoff due to development can dramatically increase stream channel erosion. This standard is intended to reduce the freque

p. 38

Water quality volume method
Equivalent to the rainfall depth in inches (using the recommended 90% cumulative frequency depth of 1.25 inches) multiplied by the volumetric runoff coefficient (Rv) for the site and the site drainage area.

In numerical terms, it is equivalent to the rainfall depth in inches (the 90% cumulative frequency rainfall depth) multiplied by the volumetric runoff coefficient (Rv) for the site, and the site drainage area.

Chapter 1- Section 4, Page 2 of 7

Peak flow calculation method(s)
Rational Method, WinTR-55 Method, TR-20 Model, HEC-1, HEC-HMS, Regression equations

Use the Rational Method for drainage areas up to 160 acres... Use the WinTR-55 Method for drainage areas up to 2000 acres... TR-20 Model... Routines contained in HEC-1 or HEC-HMS computer models... Regression equations

Chapter 1- Section 5, Page 2 of 8

Hydrologic/hydraulic software
HEC-RAS, HEC-2, SWMM, WSPRO, HY-8, WinTR-55, HEC-1, HEC-HMS, TR-20

HEC-RAS - river analysis systems... HEC-2 - water surface profiles... SWMM - stormwater management model... WSPRO - water surface profiles... HY-8 - hydraulic design of highway culverts

Chapter 1- Section 5, Page 4 of 8

Approved BMP categories
Non-structural BMPs, Stormwater Detention BMPs, Infiltration BMPs, Vegetative BMPs

8 of 10 October 28, 2009 manual. a. Non-structural BMPs. 1) Planning Procedures. Runoff problems can be addressed efficiently with sound planning procedures. Local master plans, comprehensive plans, and zoning ordinances can promote improved water quality in many ways, such a

p. 33