Stormwater Atlas

City of Cedar Rapids

SUDAS Design Manual — Chapter 2 Stormwater (city adopts SUDAS + ISWMM)

CityIowamediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

Same SUDAS Ch.2 PDF as Des Moines coverage pattern; city supplements and ISWMM also apply. Pipeline excerpt repair removed 1 unlocated citation(s).

Fields not found in document: document_metadata.last_revised_date, design_criteria.required_hydrologic_hydraulic_software, document_metadata.relationship_to_state_manual

Document Metadata

Jurisdiction level
City

No evidence cited

State
Iowa

No evidence cited

Version / edition
Chapter 02 (SUDAS Design Manual)

No evidence cited

Adoption / effective date
2019-01-01

No evidence cited

Last revised date
Not found in document

No evidence cited

Relationship to state manual
Not found in document

No evidence cited

Design Criteria

Design storm return periods (years)
2-year, 10-year, 100-year

No evidence cited

Water quality volume method
Cedar Rapids adopted SUDAS effective Jan 1, 2019 (with city General Supplements). Ordinance Ch. 72 references Iowa Stormwater Management Manual (ISWMM) Design Standards for Stormwater Management Plans. SUDAS Ch. 2 defines Water Quality Volume (WQv) and Recharge Volume (Rev) and covers conveyance/detention (2G); ISWMM guides post-construction practice sizing.

Water Quality Volume, WQv / Design Standards include ISWMM

SUDAS Ch.2 / Municode Ch.72

Peak flow calculation method(s)
Minor design storm (generally 2- to 10-year) for conveyance, Major design storm (typically 100-year) for flood routing, Detention basin design methods (Section 2G), ISWMM criteria for post-construction practices

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Detention practices, Storm sewer / intake conveyance, Water quality / recharge volume practices (ISWMM)

No evidence cited