Stormwater Atlas

City of Helena

Montana Circular DEQ-8 — Subdivision Storm Water Drainage Standards (capital)

CityDEP / DEQMontanamediumNeeds reviewCitations verified

This extraction is flagged for quality review.

Compare each cited field to the official PDF before relying on it. What this means

DEQ-8 is subdivision stormwater drainage standards — partial design coverage for capital MS4.

Other manuals in Montana: City of Missoula, Montana, Montana, Montana

Document Metadata

Jurisdiction level
City

No evidence cited

State
Montana

No evidence cited

Version / edition
2024 Edition

No evidence cited

Adoption / effective date
2024

No evidence cited

Last revised date
2024

No evidence cited

Relationship to state manual
adopts state manual directly

No evidence cited

Design Criteria

Design storm return periods (years)
2-year, 10-year, 100-year

No evidence cited

Water quality volume method
Initial Storm Water Facility must infiltrate, evapotranspire, and/or capture for reuse post-development runoff from the first 0.5 inches of rainfall on impervious areas (V = 0.5 × Aimp / 12). BMPs per Montana Post-Construction Storm Water BMP Design Manual may satisfy if they treat/remove 80% TSS.

first 0.5 inches of rainfall on impervious areas

DEQ-8

Peak flow calculation method(s)
Rational Method, Modified Rational Method, TR-55 / SCS Curve Number Method, Storage-Indication Routing

No evidence cited

Hydrologic/hydraulic software
Not found in document

No evidence cited

Approved BMP categories
Initial Storm Water Facility, Retention / Detention / Infiltration Facilities, Bioretention, Pre-treatment Facilities, Conveyance Structures

No evidence cited